ND Track 3:
High-Speed Nondestructive Testing and Intelligent Construction Systems
Track Goal: High-speed nondestructive QC can continuously monitor pavement properties during construction to provide rapid feedback. As a result, automatic adjustments can ensure a high-quality finished product that meets performance specifications.
Current projects
- Using Maturity Testing for Airfield Concrete Pavement Construction and Repair
- Accelerated Implementation of Intelligent Compaction Technology for Embankment Subgrade Soils, Aggregate Base and Asphalt Pavement Material
- Publication: Determination of Early Age Concrete Strength by a Reflective Ultrasonic Technique
- FHWA SmartCure
- Thermochron and Hygro Button Innovation
- Nondestructive Evaluation of Iowa Pavements: Phase I
- Measuring Pavement Profile at the Slip-Form Paver
- Publication: Accuracy of Ground-Penetrating Radar for Pavement-Layer Thickness Analysis
- Integrating Deflection and Ground Penetrating Radar Data for Pavement Evaluation
- Advanced Quality Systems
- FHWA CPTP Task 59 - Nondestructive and Innovative Testing Workshop
- FHWA CPTP Task 7 - Field Trials of Concrete Pavement Product and Process Technology, Magnetic Tomography for Dowel Bar Location
- Concrete Pavement Surface Characteristics Program, Part 3
- Publication: Demonstration of Seismic and Maturity Testing Technologies at Aurora Municipal Airport
- FHWA CPTP Task 7 - Field Trials of Concrete Pavement Product and Process Technology, Implementation of TEMP System
- SHRP II Project R07: Performance Specifications for Rapid Highway Renewal
- Using Scanning Lasers for Real-Time Pavement Thickness Measurement
Upcoming priorities
Not yet identified.
Subtracks
- Subtrack 1: Field Control
- Subtrack 2: Nondestructive Testing Methods
- Subtrack 3: Nondestructive Testing and Intelligent Control Systems Evaluation and Implementation
People involved
Track Team Leadership:
Carlos Caldas, University of Texas/FIATECH, caldas@mail.utexas.edu, (512) 471-6014
Gary Crawford, FHWA, gary.crawford@fhwa.dot.gov, (202) 366-1286
Jennifer Distlehorst, Kansas DOT, jenniferd@ksdot.org, (785) 291-3849
John Eisenhour, Terex RoadBuilding, jeisenhour@terexrb.com, (405) 990-1790
Fred Faridazar, FHWA, Fred.Faridazar@fhwa.dot.gov, (202) 493-3076
Gary Fick, Trinity Construction, gfick.trinity-cms@cox.net, (405) 285-2886
Jim Grove, CP Tech Center, jimgrove@iastate.edu, 515-294-5988
Ron Guntert, Guntert & Zimmerman Const Div, Inc., Rguntert@guntert.com, 209-599-0066
Carl Haas, University of Waterloo/FIATECH, chaas@civmail.uwaterloo.ca, (519) 888-4567
Todd Hanson, Iowa DOT, todd.hanson@dot.iowa.gov, (515) 239-1226
Dan Howe, LMI Technologies, dhowe@lmitechnologies.com, (248) 298-2839
Frank Jalinoos, FHWA, frank.jalinoos@fhwa.dot.gov, (202) 493-3082
Kevin Jones, Iowa DOT, kevin.jones@dot.iowa.gov, (515) 239-1226
Kevin Klein, GOMACO, klein@gomaco.com, (800) 831-2320
Jonathan Leary, Cisco Systems
Mark Leichty, Ames Engineering, mark@amesengineering.com, (515) 292-8194
John Maurer, Ames Engineering, maurer@amesengineering.com, (515) 292-8194
Jason Jon Michael, HNTB, jjonmichael@hntb.com, (816) 472-1201
Rod Montney, Kansas DOT, rodney@ksdot.org, (785) 291-3849
Vance Pool, NRMCA, vpool@nrmca.org, (281) 557-8415
Kamel Saidi, University of Texas/FIATECH/NIST, kamel@mail.utexas.edu, (512) 475-9741
Doug Schwartz, Minnesota DOT, doug.schwartz@dot.state.mn.us, (651) 366-5576
Bryce Simons, New Mexico DOT, bryce.simons@nmshtd.state.nm.us, (505) 827-5191
Shannon Swietzer, North Carolina Turnpike Authority (AFH50), shannon.sweitzer@ncturnpike.org, (919) 510-4372
Dennis Turner, The Transtec Group, dennis@thetranstecgroup.com, (512) 451-6233
Dennis Warren, TCPA, dennis@texasconcrete.org, (713) 816-2169
Leif Wathne, ACPA, lwathne@pavement.com, (202) 638-2272
Paul Wiegand, CP Tech Center, pwiegand@iastate.edu, 515-294-7082

