RC Track 7:
High-Speed Concrete Pavement Rehabilitation and Construction
Track Goal: This track will explore new and existing products and technologies that facilitate high-speed rehabilitation and construction of PCC pavements.
Current projects
- FHWA CPTP Task 58C - The Use of Precast Concrete Panels to Expedite Highway Pavement Construction Phase 3: Demonstration Projects
- 8th International Conference on Concrete Pavement, Hot Topic Workshop: Precast Paving Forum
- Publication: Overnight Concrete Pavement Replacement Using a Precast Panel and Expanding Polymer Positioning Technique-Washington Dulles International Airport Case Study
- Intermittent Slab Replacement with Super Slab Precast Pavement
- Cost Analysis of Rehabilitation/Reconstruction of the Nation's Highway Infrastructure
- HIPERPAV Workshops
- Precast Prestressed Concrete Pavement for Bridge Approach Slabs Showcasing Workshop
- ModieSlab
- FHWA CPTP Task 7 - Field Trials of Concrete Pavement Product and Process Technology, Precast Concrete panel System for Full Depth Repairs
- FHWA CPTP Task 58 - Prestressed Precast and Post-Tensioned Concrete Panels for Pavement Construction and Rehabilitation
- Continuous Slab Replacement with Super Slab Precast Pavement
- National Rollout of Precast Prestressed Concrete Pavement Technology
- Publication: Precast Concrete (PC) Pavement Tests on Taxiway D-D at LaGuardia Airport
- CA4PRS Software
- FHWA CPTP Task 1 - Traffic Management Optimization Pilot Studies for Reconstructing Urban Freeways
- CA4PRS Training Workshops
- FHWA CPTP Task 7 - Field Trials of Concrete Pavement Product and Process Technology, Weekend Intersection Reconstruction
- ACTT Workshops
- Systemwide Impact of Safety and Traffic Operation Design Decisions for Resurfacing, Restoration, or Rehabilitation (RRR) Projects
Upcoming priorities
Not yet identified.
Subtracks
- Subtrack 1: Rehabilitation and Construction Planning and Simulation
- Subtrack 2: Precast and Modular Concrete Pavements
- Subtrack 3: Fast-Track Concrete Pavements
- Subtrack 4: Rehabilitation and Construction Evaluation and Implementation
People involved
Track Coordinator:
Dale Harrington, Snyder & Assoc, dharrington@snyder-associates.com, 515-290-4014
Track Team Leadership:
Andy Bennett, Michigan Department of Transportation, bennetta@michigan.gov, (517) 322-5043
James K. Cable, Iowa State University, jkcable@iastate.edu, (515) 294-2862
Dan DeGraaf, Michigan Concrete Paving Association, ddegraaf@miconpave.com, (517) 347-7720
Jim Duit, Duit Construction, jimduit@duitconstruction.com, 405-340-6026
Todd Hanson, Iowa DOT, todd.hanson@dot.iowa.gov, (515) 239-1226
Kevin Maillard, OHM Advisors
Randy Riley, ACPA-Illinois Chapter, pccman@insightbb.com, 217-793-4933
Robert Rodden, ACPA, rrodden@pavement.com, (847) 972-9808
Jim Sherwood, Federal Highway Administration, (202) 493-3150
Shannon Swietzer, North Carolina Turnpike Authority (AFH50), shannon.sweitzer@ncturnpike.org, (919) 510-4372
Sam Tyson, FHWA, sam.tyson@fhwa.dot.gov, (202) 366-1326
Jeff Uhlmeyer, Washington DOT, uhlmeyj@wsdot.wa.gov, (360) 709-5485
Leif Wathne, ACPA, lwathne@pavement.com, (202) 638-2272
Matt Zeller, Minnesota ACPA, mjzeller@cpamn.com, (651) 762-0402